Commercial demolition cost UK: £30 to £150+ per m² in published prices

Updated

Commercial demolition costs £30 to £150 or more per m² in one firm's published price (read 30 October 2026). Another says projects often start at £25,000.

Get demolition quotes

Commercial demolition prices firms publish

Commercial demolition prices as published by UK demolition firms, read 30 October 2026
FirmWhat the firm publishesPublished priceSource
SCS Demolition Contractors LondonCommercial demolition, partial or full, priced per project or per m²£30 to £150+ per m² SCS Demolition Contractors London, demolition company cost (read 30 October 2026)
SCS Demolition Contractors LondonOffice demolition or strip-out£25 to £95 per m² SCS Demolition Contractors London, demolition company cost (read 30 October 2026)
SCS Demolition Contractors LondonInterior demolition (strip-out)£20 to £80 per m² SCS Demolition Contractors London, demolition company cost (read 30 October 2026)
PBM ContractorsCommercial or industrial projectsOften from £25,000 PBM Contractors, the cost of demolition in the UK (read 30 October 2026)

These are the firms' own published ranges, not a quote. SCS names what moves a commercial price: structural complexity, neighbours, phasing, and dust and noise controls, with working hours, lifts and stairs and out-of-hours requirements on an office strip-out.

What a commercial job needs before demolition starts

  • A written demolition plan. Regulation 20 of the Construction (Design and Management) Regulations 2015 requires the arrangements for demolition to be recorded in writing before the work begins (legislation.gov.uk).
  • HSE notification on a large job. A project scheduled to last longer than 30 working days with more than 20 workers on site at once, or to exceed 500 person days, is notifiable, and the client must tell the HSE in writing before the construction phase begins (regulation 6).
  • A refurbishment and demolition asbestos survey of the parts being demolished, see the asbestos survey guide.
  • A Section 80 notice to the local authority at least 6 weeks before starting, see the Section 80 guide.

Disposal on a commercial site

Most of a commercial building's weight is concrete, brick and steel. Clean inert rubble is taxed at the lower Landfill Tax rate of £8.65 per tonne, against £130.75 for standard waste in 2026 to 2027 (HMRC).

Steel is sold for scrap, so how well a contractor separates the arisings moves the price. Ask each quote how the waste is handled.

Commercial quotes vary more than domestic ones. Our form takes two minutes and local contractors quote you directly.

Get demolition quotes

Two minutes of questions; local demolition contractors quote you directly. Free, no obligation.

The job

What needs demolishing?

Excavator access costs far less than demolishing by hand.

  • Free, no obligation
  • Your details go to at most three contractors
  • Takes about two minutes

Questions, answered directly

How much does commercial demolition cost in the UK?

£30 to £150 or more per m² for partial or full commercial demolition in SCS Demolition Contractors London's published prices (read 30 October 2026). PBM Contractors says commercial and industrial projects often start at £25,000. Structure, neighbours, phasing and access decide where a building lands, so get quotes for the actual site. (SCS Demolition Contractors London, demolition company cost (read 30 October 2026))

Sources

This site's own datasets, every figure quoted from its source and dated:

  1. legislation.gov.uk, Building Act 1984, Section 80 (notice of intended demolition)
  2. HSE, asbestos surveys (refurbishment/demolition surveys)
  3. HSE, demolition health and safety topics

Get your actual number, not a range.

Two minutes of questions; local demolition contractors quote you directly. Free, no obligation.

Get demolition quotes