Guide
Pre demolition survey: the asbestos survey you cannot skip
Updated
Every demolition starts with one question: what's in the building? Until a refurbishment/demolition asbestos survey answers it, no responsible contractor will firmly price or start the job.
Why it's required
Under the Control of Asbestos Regulations 2012, asbestos-containing materials must be identified and dealt with before demolition or major refurbishment. HSE guidance is explicit that the survey needed is the refurbishment/demolition survey (hse.gov.uk/asbestos/surveys).
It is a fully intrusive inspection, opening up floors, ceilings, ducts and voids a standard management survey never touches. Any building built or refurbished before the year 2000 can contain asbestos, so for pre-2000 buildings the survey is a given, not a maybe.
Pre demolition asbestos survey or pre refurbishment asbestos survey?
HSE treats them as one survey type, the refurbishment and demolition survey, set out in its survey guide HSG264.
An asbestos survey before renovation or refurbishment covers only the parts the work will disturb. A pre demolition survey covers the whole building, because all of it is coming down. Surveyors price the two differently, and a refurbishment report does not stand in for a demolition one if the plan changes.
What it involves and what it costs
- Intrusive inspection: the surveyor breaks into the building fabric, so the building needs to be empty and the survey is destructive by design.
- Sampling and analysis: suspect materials are sampled and lab-analysed; the report maps what was found and where.
- Cost: priced per building by size and complexity. One surveyor, Asbestos Survey & Monitoring, publishes a demolition asbestos survey as "usually from £320 + VAT" and a refurbishment survey as "usually from £280 + VAT" (read 30 October 2026); larger or complex buildings cost more.
- Timing: book it inside the Section 80 notice period so the results are back before your start date, see the Section 80 guide.
How findings change the demolition price
If the survey finds asbestos, removal happens before demolition. Lower-risk materials like asbestos cement sheets can be removed by contractors following the right controls.
Higher-risk materials (sprayed coatings, insulation, insulating board in most cases) need a licensed asbestos removal contractor, priced separately from the demolition. So quoting before the survey is guesswork: the same house can be straightforward, or have a five-figure removal phase in front of it.
Get the survey, then get the quotes; our form puts the job in front of local contractors either way.
Who does what
- You (or your contractor) commission the survey from an asbestos surveyor; UKAS-accredited surveying firms are the benchmark to ask for.
- Removal firms deal with what's found, licensed removal where the material requires it, notification to the regulator where the work is notifiable.
- The demolition contractor takes the building down once the site is clear, holding the survey report and clearance paperwork in the job file.